From photo to verified
Captured in seconds
The capture button opens the camera. Add a title, pick the company and a due date, done.
A clear status
Open, in progress, reported fixed, verified: every change is kept in the item’s history with its time.
Overdue stands out
Items past their due date are flagged in the list and counted in the project overview.
Pinned on the plan
Import a plan as a PDF or an image and place a pin for each item. Its color shows the status.
What you record for each item
Only the title is required. Everything else helps the company find and fix the item.
- Title and description
- Location: building, floor and room
- Any number of photos, marked up with arrows and text
- Trade and responsible company
- Due date and priority
- Kind: defect, outstanding work or damage

How it works
Capture
Take a photo on your walk and add the essentials.
Assign and send
Assign the company and a due date, then send that company its list as a PDF.
Check and close
When the company reports an item fixed, check it on site and mark it verified.
PDF reports, ready to share
A few taps turn your records into a clean PDF, with your photos and your plan.
- Punch list report: all items, per company, only open or only overdue
- Site diary: a single day or a date range, with or without photos
- Handover protocol with the signatures and the defects as an appendix
- Creating and sharing reports is free in every plan


Frequently asked questions
Can I send each company only its own items?
Yes. A punch list report can cover all items, those of one company, only the open or only the overdue ones.
How many items can I record for free?
Up to 25 in one project, with every feature and the PDF export. The Project Pass or Pro removes the limit.
Can I change several items at once?
Yes. Select several items and change their status, company or due date in one step.

